Page tools

Page tools



Imagery


Heave Control Injection Systems 1

Electrochemical injection to reduce heave for the Grapevine Vineyards building in Grapevine, TX.

Download (File Size: 44 KB bytes)

 

Heave Control Injection Systems 2

Water injection to preswell clays reducing heave potential for a planned subdivision in Lewisville, TX.

Download (File Size: 70 KB bytes)

 

Heave Control Injection Anchors

Anchors for heave control for a spillway at the Big Creek Dam in Mobile, AL.

Download (File Size: 51 KB bytes)

 

Heave Control Injection Systems 3

Electrochemical injection to reduce heave for the Lake Dallas High School in Lake Dallas, TX.

Download (File Size: 38 KB bytes)

 

Hayward Baker Ranked #1 by Engineering News-Record (ENR)

#1 Foundation Contractor Learn more
Hayward Baker consistently performs in an outstanding manner in all aspects of construction contracting with the Corps Memphis District. The Quality Control system is a very effective forward-thinking team than can resolve issues before they cause delays to the work. - Linda G. Boyd, Acting Chief, Con-Ops Division
U.S. Army Corps of Engineers - Memphis District