Page tools

Page tools



Imagery


Chemical Grouting Plant

Chemical grouting for groundwater control and excavation support at a header pipe and electrical duct banks for an addition at the East Central Regional Waste Water Treatment Plant in West Palm Beach, FL.

Download (File Size: 98 KB bytes)

 

Chemical Grouting Building Commercial

Chemical grouting for underpinning and excavation support of an existing restaurant immediately adjacent to a planned 5-story office condo in Boca Raton, FL.

Download (File Size: 104 KB bytes)

 

Chemical Grouting Tunnel

A chemically grouted break-out for an tunnel access shaft for construction of twin subway tunnels at the LACMTA Eastside Extension (Goldline) project in Los Angeles, CA.

Download (File Size: 64 KB bytes)

 

Hayward Baker Wins AGC St. Louis Keystone Award

General Contractors of St. Louis Names Hayward Baker a Keystone Award Winner Learn more
Hayward Baker Inc. performed jet grouting work for the U.S. Army Corps of Engineers, Pittsburgh District under two separate contracts. The work performed by Hayward Baker Inc. has been of the utmost quality on our two projects. The expertise and recommendations that were provided by your employees were an integral part of our success. - Joseph O. Elwell, Jr., P.E., Authorized Representative of Contracting Officer
Department of the Army